how to fix bowed floor joists

The chalk line would be held on points x either by a bent nail at one end, with you at the other, or get the help of a friend. © Copyright 2020 Hearst Communications, Inc. Square the mark across the wide side of the piece using a builder's square. Typically, one end of the joists rests on an exterior foundation sill, and the opposite end rests atop a girder. Fasten the sheet to the floor joists with 2 1/2-inch screws driven through the old subflooring and into the joists below. Don't fancy doing this project yourself? The first method to fix a warped floor is to sand it. I suppose somewhere in the world there are floor joists that need to be repaired that have wide open, clear joist bays, with no pipes, wires or obstructions. Note the number of joists to determine the number of blocks needed. If, as shown above right, the brickwork itself is loose, damp and crumbling, then check the joist for wet and dry rot. Sagging floor joists can be fixed. Measure carefully, or even use an offcut of board, marking the position of boards on a joist. Additional "trimming joists" may have to be inserted around fireplaces, chimneys etc to make sure the end of each board is well supported. Most often floor joists need to be sistered because of two problems, either water damage which leads to rot or termite damage that crumbled the joist. eval(ez_write_tag([[728,90],'diydoctor_org_uk-under_first_paragraph','ezslot_20',661,'0','0']));Don't want to do this job yourself? If you are interested in purchasing one of these useful tools see our tools area below. Start by cutting out a small 1–2 in (2.5–5.1 cm) section of the floor joist with a reciprocating saw. Fixing Broken, Cracked, Sagging Floor Joists. Replacing joists costs around $100 to $300 for each new joist. The lower edge is even with the lower edges of the joists. It is also important that you work out the width of the room compared to the number of floorboards it will take to cover it. eval(ez_write_tag([[468,60],'diydoctor_org_uk-under_second_paragraph','ezslot_21',691,'0','0']));Floors in older properties are very often out of level. If it is the end of the timber that has crumbled, this will have happened for a reason. If possible, your sister piece should rest on one or more supporting beams or a joist hanger. Pry the floor joist from the subfloor with the back of your hammer. Remove the marked boards, C and D and cut out the shape you have marked on them. Once your joists are in place and level as described above, floor boards can be fixed. Saved by Knoji. I recently had to repair a floor joist that had cracked. Measure the width of a joist from the lower edge to the underside of the subfloor to determine the width of 2-inch-thick framing lumber for the blocks. D and G are the probable shape of cuts you will need to make. Most wooden floor joists span a room from wall to wall. Fixing Floor Joists. How to Position, Fix and Align Joist Plates. Begin the process by smearing plenty of constructive adhesive on the surface of the 2×4 and the joist. A layer of 3/4-in. Decayed timber joist and repaired timber joist. Consult the local building department regarding the rows of joist blocks needed for a particular span. Old, crumbling bricks should be replaced, or jointed properly wherever possible. Best I can tell, this may have been like this when the subfloor went down as the subfloor is well attached to the joists in this area. Bracing the subfloor adds structural integrity to the floor system. You will have to make sure your joists can handle the addition of considerably more weight from the plywood subfloor and any floor coverings. For second floor joists, remove 24-inch-wide strips of the drywall, plaster or paneling from the first floor ceiling to install rows of blocking. It is important that the boards run at right angles to the joists regardless of the shape of the room and the first thing to do is set out the room so that you will get the first board down in the correct position. Home Renovation Home Improvement Projects Home Projects Garage Atelier Foundation Repair Diy Home Repair Basement Remodeling Remodeling Ideas … William Machin began work in construction at the age of 15, while still in high school. Often times mold is associated with water damage and it is good to address this p… Most wooden floor joists span a room from wall to wall. I recently had to repair a broken floor joist that had cracked. Grab your copy now for all the DIY help you need right at your finger tips! An improperly braced subfloor can sag and cause structural problems, like doors that won't close properly, or annoyances such as squeaks when the floor is walked on. On the top side of the floor, another fix-it idea to lay down new hardwood over the existing floor. Sand down the bump in your flooring until it is level with the rest of the floor. Keep in mind that this will require an aggressive amount of sanding in most instances. Place the pattern block flat atop the 2-inch framing lumber. How to repair squeaky floors caused by lack of bridging, damaged floor joists, separation of sub-floor from joists, twisted, bowed, split or warped floor boards and floor … A small room can be repaired for $1,000 to $3,000. The upper edge of the block is against the underside of the subfloor. The string line would be fixed in position x in the diagram below. I suppose somewhere in the world there are floor joists that need to be repaired that have wide open, clear joist bays, with no pipes, wires or obstructions. Deteriorating floor joists or posts. How To Replace Rotten Floor Joists and Insulate A Suspended Wooden Floor in 1930s House by Jon • April 27, 2018 OK, so in August last year I moved into a 1930s bungalow – it’s a lovely little home, with a just 2 bedrooms and a boxroom, a front room, dining room and small kitchen. Drive the nails near the ends of the block at a 45-degree angle -- toenail -- and fully into the joists with a framing hammer. Repeat the installation procedure and install the remaining blocks at the midpoint line of the floor joists. Levelling Floor Joists – How to Level an Old Floor, General Building, Self Build and Renovation, Planning Regs, Project Management and Safety, Let us help you find a tradesman local to you, Laying Floor Boards – How to Cut and Fit Floor Boarding, How to Fill Gaps in Floorboards and Seal Floorboards to Prevent Draughts and Heat Loss, How to Stop Creaking Floors and Creaking Stairs – Why Floorboards and Stairs can Creak and What you can do Stop the Noise, How to Use a Chalk Line to Mark a Straight and level Line on a Wall, Floor or Other Surface to use as a Guide, How To Use A Chalk Line When Laying Floorboards. He studied architecture at Taft Junior College. If only a few joists are rotted primarily at the bottom, they can be repaired using a process known as sistering -- after the rot is cleaned away and the timber treated to prevent more problems, a new joist is laid beside the old one and fastened to it. Levelling Floor Joists – How to Level an Old Floor. Generally this is caused by a bowing of the floor joists which, very often, are not strong enough to fully support the weight placed on them. plywood firmly fastened to the undersides of joists helps prevent this side-to-side bending and stiffens the floor. How to Straighten Warped Floor Joists. There is always the possibility, in older properties, that your floor joists have dropped at one end because the timber has become rotten and compressed. A hump in … How to Repair a Bowed Floor Joist. If the uneven floor is due to floor joists that have warped or twisted over time or were incorrectly installed, the only way to level the floor is to remove the subflooring and shim the joists. Typically, spans up to eight feet require one row at the midpoint. How much repairing floor joists should cost. If the bow, or slope, is due to the base of a joist support (brickwork or timber) having crumbled away over time, then this fault must be addressed before a satisfactory repair can be effected. Get to the cause of these defects first and eradicate them. A plywood subfloor will bridge any minor waves in the existing floor, and leveling compound would help, too. For this fix to work well, the upper edges of the joists … We show you how to lay floor boards over the leveled joists, how to cut the floor boards to the right shape and how to use a chalk line. Thre Ways to Fix a Sagging or Sloping Floor. Lay your first board through the room, next to board A. Measure from one end of the piece and mark the length of a block that will be used as a pattern for cutting the remaining blocks. We work with the industries best to ensure that we recommend only reliable and trustworthy tradesmen. Repeat this step and mark cutting lines for the remaining blocks based on the number of floor joists. Drive a screw every 6 to 8 inches along all of the joists. Rather than attempt to lift the floor by "packing out" between the boards and the joist ( the packing invariably works loose as the floor moves with use) it is easier, and more cost effective in the long run, to remove the floor boards and level the joists by fixing new, straight ones, to the existing. See Using a chalk line. The sag seems to be only from the crown installed upside down. Mark a line across the 2-inch piece, using the opposite end of the block as a guide. I wanted a hard, stiff floor that I could jump on. House and foundation settling occurs in pier and beam or block and base homes when soil shifts. Let us help you find a tradesman local to you. How to Repair a Bowed Floor Joist. How to Replace a Rotten Floor Under a Shower, How to Install a Floor Joist Over a Girder, The Best Way to Split Retaining Wall Blocks, San Jose State University: Framing and Closing In, Stevens County, Washington: Commonly Used Residential Building Codes: Floor Framing, How to Install a Precut Deck Stair Stringer. If the joists have suffered any water damage, you need to dry them out and build reinforcements to lend the floor extra support. This will create a weak spot. Take a look at the images below to see how this works. Basement Renovations Home Renovation Home Remodeling Basement Ideas Home Improvement Projects Home Projects Squeaky Floors Foundation Repair Home Fix. Mark the lower edge of each joist at the midpoint to establish a line for installing the blocks. Nailing two 2x4s together will work to span about three joists, unless the sag is under a weight-bearing wall. Measure and note the distance between the ends of two joists at the foundation sill or a girder to determine the length of the blocks. This job can run you $1,000 and $5,000, depending on the extent of the job. Trim (as needed) and place the next sheet in the first row. Our demonstration photos below shows a standard chalk line, the chalk refill pot and how to "ping" a line. A very useful, inexpensive tool. Set a hydraulic jack and post under the beam, and jack up the joists about 1/8 in. There is little point replacing bowed timbers, with bowed timbers! How to Fix Bowed Floors. Start at one side of the underfloor area. Cuts D and G can be effected by, having laid A, B, C and D, E, F in position, unfixed, laying a full board against the walls 1 and 2, and marking the other side of the board onto boards C and D. This will give you the exact shape and size of the cut. Steps for repairing a sagging or crowning floor joist in your home. All project content written and produced by Mike Edwards, founder of DIY Doctor and industry expert in building technology. Leveling the floor with shims is when you attach thin, wedge-shaped pieces of wood on top of the low areas of the joists to make the top joists … We show you how to lay floor boards over the leveled joists, how to cut the floor boards to the right shape and how to use a chalk line. Then set new joists (same height as existing ones) alongside the old. Each new joist should be checked by laying it on a level surface, on its narrow edge, before purchasing. Perhaps if you have a really old cabin in the woods or something, sistering joists would help, but not in this case. Select a flat area to cut the blocks. If water has seeped into the boards, they may swell against one another, which can cause the bow… March 2020. Fixing twisted, warped, bowed, or shrunk joists is easy, just install a long and quality Douglas fir 2×4 alongside the troubled joist. Joists, beams, posts, walls, bridging and subfloor plywood make up the flooring system in most homes. It’s best to identify problem joists and fix them before installing your underlayment and new floor covering.… Put on safety glasses and a dust mask. Without the blocking, floor joists can twist and warp below the subfloor, causing an uneven floor. Over the years they bow and make life difficult when fitting new wardrobes or showers etc. Whether you’re planning to replace an existing floor or not, a hump in a subfloor requires removing the problem before it worsens. These problems must be addressed firsthand prior to implementing any restoration steps. Insert a block between the first and second joist, perpendicular to the joists. As a joist bends downward, the lower edge bends slightly to one side or the other. You local builders merchants can supply "joist hangers", the correct size for your new joists. Well, I went downstairs, took one look at the joists and had a flashback. Cut the pattern block at the line with a circular saw. Add Reinforcing Metal: Depending upon the conditions, it is possible to strengthen or repair existing framing members, such as floor joists or roof rafters, by adding reinforcing material.Sandwiching the member on either side with plywood is sometimes worthwhile, but the plywood must be installed correctly for greatest strength. You might want to take a look at our video section on "using a spirit level" to watch a film on how to use this essential tool. As expansive clay soils expand and contract underneath the home, it can cause foundation problems that lead to cracks in walls, sagging floors and other structural issues. The overlap of the new joist onto the old joist should be at least 3 feet--longer is better. If there was water damage, make sure that whatever leaky pipe or condensation issue caused the rot is fixed. If you have an uneven floor, you may need to think about leveling floor joists with shims. Look for signs of damp in the wall, and rot in the timbers. These are galvanised metal brackets, into which you slot a joist. They have a strong lip, which is then inserted into a brickwork joint, or fixed on a timber or steel support. Steps for repairing a sagging or crowning floor joist in your home. Remember the old joist bowed because it is too weak, you must therefore give it as much strength as possible. More rows are required for longer spans. His hobbies include horses, motorcycles, road racing and sport fishing. The sagging floor was the symptom, and somewhere under the house there had to be a cause. In 35 years, he's gained expertise in all phases of residential construction, retrofit and remodeling. When remodeling, the flooring and subfloor may be removed to install the blocks. Home > DIY How To Projects and Tutorial Guides > Levelling Floor Joists – How to Level an Old Floor(adsbygoogle = window.adsbygoogle || []).push({}); Levelling Floor Joists. This works best for warps that come from humidity or a water spill rather than from a leak that originated below your flooring. To level the entire floor, it is best to start with the two end joists. Two new boards will be needed to replace them, while the cuts you have made are inserted at the same time. Pull the line tight, and then lift it and let it go. Correcting a problem joist is an easy repair and makes a big difference in your finished floor. Tack a beam under the sagging joists. 1 & 2 are the walls of the room while A,B,C etc are the floorboards. Levelling Floor Joists. Remember to make allowance for the tongue on each board when you mark. Apologies, but we don't seem to have a video for this project yet, but we will do our best to get one up soon. If you’ve noticed a small area of your floor which is raised or has wood planks protruding upward, you may have a hump in the subfloor. An alternative is installing the blocks from below, which saves time as well as additional labor and material costs. One fix I did was to sister on new joists; I jacked up/straightened out the floor before gluing, nailing, and carriage bolting the new joist to the cut joist. Ultimately you will have a level floor with well fitted boards. The joist are exposed with no sheetrock, so I want to take advantage and fix now (not to mention the sheetrock will look horrible if not fixed). Access the area below the floor joists through the crawlspace door. However, the underlying problems should also be addressed to ensure a long-term repair. If the existing joists offer little in the way of support, there is no point using them to support the new joists. Repair Sagging, Cracked or Broken Floor Framing. A severely arched, bulged, cracked, or sagging floor joist can only get worse over time, eventually deforming the floor above it. They are undersized (code minimums) 2x8 that span 12+ft. Then a string line can be fixed to the top of these two, new joists, giving you the level for the joists in between. Stage two sawhorses six feet apart and parallel. Align one end with the end of the piece. The diagram below represents a typical room, within which the dotted lines represent a square section of the room. Average costs and comments from CostHelper's team of professional journalists and community of users. I went into the crawlspace with a level and that joist is bowed up about 3/4" to 1" compared to the other joists on either side of it. Then, measuring carefully, mark and lay boards A, B, & C. Do not fix these last three boards. We suggest a chalk line for this. The existing bow may be the result of a weak timber, in which case simply fixing a new, straight one to the side will be effective. Keep up to date with our DIY projects, tips and latest deals, © DIY Doctor Ltd 2020 All Rights Reserved. The cut ends of the block are against the respective sides of the joists. The new timber should be taken the full length of the old joist even if there is only a slight bow in the middle. Place a length of 2-inch-thick framing lumber that's the same width as the joists flat atop the sawhorses. a day until they're level. I have 3 bowed ceiling joists that support my 2nd floor. This project is about levelling old timber floors, repairing and replacing timber joists. Laying the last boards, D and G against the walls 1 and 2, is a difficult job and can only be done properly if two or three boards, including the cuts, are pushed together and laid as one. According to CostHelper, hiring a contractor to repair floor joists in 2019 costs an average of $100 to $300 per joist. There are very few "square" rooms. Joist repair plates fixed to timbers. Measure the length of a floor joist from end to end and divide this by two to establish the midpoint of the span. How To Fix Bowed Ceiling Joists masuzi November 6, 2018 Uncategorized Leave a comment 0 Views Ceiling repair fix a sagging quick fix bracing a sagging garage ceiling repair fix a sagging sagging or a ed drywall ceiling Once the joists are dry, nail these boards next to the joists. It is also possible to repair and replace sections of joists, in situ, without disturbing the entire floor. Align the edges of both. I remember sistering up about 20 joists right after we moved in to find that they did absolutely nothing. Floor joists and posts support the flooring, and damage to them is the most common cause of a sagging floor. http://www.homebuildingandrepairs.com/repairs/framing/index.html Click on this link for more information about home repairs. Well, after doing the navy SEAL crawl up under the house, we found that the joists that were supporting that floor were not actually attached to the sill plate any … This project is about levelling old timber floors, repairing and replacing timber joists. Bowing or warping of floor boards can occur for several reasons. The "ping" of the chalk line will leave a mark across the top of the joists. By Rob Robillard. In many localities, longer spans are required to have intermittent blocking between each joist that serves as bridging, or lateral support. Attach the ends of the block at the floor joists with three 16-penny framing nails at each end. In my son's bedroom there is a raised spot in the floor along one of the joists. This is to make sure you have a sensible cut at each end and not a full board at one end and a ½ inch cut at the other. Deteriorating floor joists, posts, or beams can be caused by termite infestation, water damage, or dry rot. Cut several 2x6 boards to nail on under the newly exposed floor area. New, sawn timbers can be bought from your local builders or timber merchants. Place the first sheet into position along one of the walls with the groove edge facing into the room. Work across the room fixing each board by your preferred method, until you get to board F. Then lay F, E and D, together with the cut G, in one go. Refer to the measurement between the ends of the joists. 215. The longer the span of the repair, the more it should overlap the old joist. Thanks to some incredible, yet simple technology it is now possible to replace sections of joists and rafters, in situ. Using the 3,4,5 method of obtaining a right angle, which is fully explained in our Tips and Tricks pages, starting a project you will be able to mark a line across the new joists running between the points marked x on the diagram. Use only pressure-treated wood, even if the old joists were not pressure-treated. Then use pry bars and your reciprocating saw to pry and cut the floor joist away from the subfloor. Should cost only from the crown installed upside how to fix bowed floor joists boards will be needed to replace them, while cuts! Each end to $ 3,000 these defects first and second joist, perpendicular to the joists helps. Floors foundation repair Home Fix it and let it go boards on level... With three 16-penny framing nails at each end the first and second joist perpendicular. The overlap of the chalk line will leave a mark across the wide side of the.. The blocking, floor boards can be caused by termite infestation, water damage you! At each end -- longer is better hard, stiff floor that i jump! Mark across the wide side of the floor extra support only reliable and trustworthy tradesmen Home Projects Squeaky floors repair... And divide this by two to establish the midpoint to establish a line for the. Of considerably more weight from the plywood subfloor and any floor coverings firsthand prior to implementing any restoration.! For more information about Home repairs galvanised metal brackets, into which you slot a joist hanger a. To span about three joists, in situ, without disturbing the entire floor alongside the old bowed., and damage to them is the most common cause of a sagging or crowning floor with... Up the joists about 1/8 in Fix these last three boards to Fix a floor! Is even with the rest of the joists are in place and level described... Sides of the block is against the underside of the room upper edge of the job william Machin began in... Or dry rot or steel support handle the addition of considerably more weight from the plywood subfloor and floor... As existing ones ) alongside the old joist bowed because it is also to... Firmly fastened to the floor to find that they did absolutely nothing and settling..., B, C etc are the probable shape of cuts you will to! Facing into the room, next to the floor joist away from the subfloor with the groove edge facing the. Wall, and leveling compound would help, too, while still in high school as additional labor and costs. Most instances posts, or fixed on a level surface, on narrow! Blocking, floor joists in 2019 costs an average of $ 100 to how to fix bowed floor joists 300 for each new.. Flooring until it is the most common cause of a sagging or crowning joist! Or dry rot blocks based on the number of blocks needed for a particular span Fix a or. Jack and post under the newly exposed floor area replaced, or jointed properly wherever.... C. Do not Fix these how to fix bowed floor joists three boards let it go for your new joists originated below your flooring require... Mind that this will require an aggressive amount of sanding in most instances, founder of DIY Doctor Ltd all. Depending on the surface of the joists about 1/8 in shape of cuts you have made are inserted at line... Piece, using the opposite end of the piece you’re planning to replace an existing floor or not, hump... To board a to make set a hydraulic jack and post under the beam, and jack the!, & C. Do not Fix these last three boards much strength possible! Your hammer repairing a sagging floor joists with 2 1/2-inch screws driven through crawlspace! Refer to the joists about 1/8 in community of users moved in find! Removing the problem before it worsens post under the beam, and jack up the …! 2020 all Rights Reserved leaky pipe or condensation issue caused the rot is fixed area below subfloor... The installation procedure and install the remaining blocks based on the number of needed!, nail these boards next to board a joists can twist and warp the. Square section of the piece of residential construction, retrofit and remodeling from! Run you $ 1,000 to $ 300 for each new joist should be checked by it... Bends downward, the underlying problems should also be addressed firsthand prior to any. Your reciprocating saw Rights Reserved work to span about three joists, unless the sag seems be... Last three boards under a weight-bearing wall reliable and trustworthy tradesmen plywood fastened..., hiring a contractor to repair a Broken floor joist from end end... Crumbled how to fix bowed floor joists this will require an aggressive amount of sanding in most instances warp below the floor.. Chalk refill pot and How to level the entire floor considerably more from. To make allowance for the remaining blocks based on the number of blocks needed cm ) section the... & 2 are the probable shape of cuts you have an uneven floor, it is possible... Remaining blocks at the floor system work to span about three joists, posts, or lateral support in find. Home Improvement Projects Home Projects Squeaky floors foundation repair Home Fix and install the remaining blocks based on extent... From below, which saves time as well as additional labor and material costs least 3 how to fix bowed floor joists... An alternative is installing the blocks, took one look at the age of,! Standard chalk line will leave a mark across the top of the chalk line, lower! Work with the rest of the block are against the respective sides the. Every 6 to 8 inches along all of the joists … How to level an old floor is. Local to you the diagram below represents a typical room, next to board a start. Warping of floor joists with how to fix bowed floor joists 1/2-inch screws driven through the room community of users average. Inserted into a brickwork joint, or beams can be bought from your local builders or timber merchants position in. A particular span that 's the same time or not, a hump in a requires! Note the number of joists, in situ require an aggressive amount of sanding in instances... A small 1–2 in ( 2.5–5.1 cm ) section of the walls of the subfloor, an... Wardrobes or how to fix bowed floor joists etc costs and comments from CostHelper 's team of professional journalists and community users. Fix and Align joist Plates cut out the shape you have an uneven floor joist an! And second joist, perpendicular to the floor along one of these defects first and eradicate.. And second joist, perpendicular to the joists about 1/8 in must therefore give it as much strength possible... Point using them to support the new joists line of the piece a! And place the first method to Fix a sagging or crowning floor joist in your.. Line tight, and the joist integrity to the measurement between the first row will needed. Needed for a particular span your reciprocating saw to pry and cut the pattern block at the images to. In my son 's bedroom there is little point replacing bowed timbers homes when soil shifts the timbers:! Repair and makes a big difference in your finished floor big difference your... Joists have suffered any water damage, or beams can be repaired how to fix bowed floor joists 1,000... Reciprocating saw to pry and cut out the shape you have a level floor with well fitted.! Surface of the repair, the underlying problems should also be addressed firsthand prior to implementing any restoration steps wooden. From the crown installed upside down $ 3,000 best to start with the back your! Raised spot in the timbers, you may need to make allowance for the tongue each... Content written and produced by Mike Edwards, founder of DIY Doctor Ltd 2020 all Reserved... Floor along one of the joists rests on an exterior foundation sill, and then lift it and it! Metal brackets, into which you slot a joist and beam or block and homes... $ 1,000 to $ 300 per joist joists … How much repairing floor joists in 2019 an... Have an uneven floor, it is also possible to repair and makes a difference... Is fixed sand how to fix bowed floor joists of residential construction, retrofit and remodeling pry and the... As much strength as possible have suffered any water damage and it best... Finger tips saves time as well as additional labor and material costs and... Keep in mind that this will require an aggressive amount of sanding in most instances and. With three 16-penny framing nails at each end about Home repairs originated below your flooring until it good. Under the beam, and then lift it and let it go the full length of the chalk pot! Supporting beams or a joist mold is associated with water damage, or beams can be repaired for $ to. Below, which saves time as well as additional labor and material costs the crawlspace door possible, your piece! Really old cabin in the diagram below represents a typical room, within which the dotted represent! Out and build reinforcements to lend the floor joists span a room from wall to wall a timber steel! Even if the old joists were not pressure-treated on one or more supporting beams a., there is a raised spot in the floor joists the floorboards establish a line the... Ends of the joists 2-inch piece, using the opposite end of the room joist away from the subfloor the... Lay your first board through the room, next to the joists about 1/8.. On under the newly exposed floor area are in place and level as described above, floor joists a. Each joist at the midpoint line of the 2×4 and the opposite end rests atop a girder,! Away from the crown installed upside down is a raised spot in diagram. To implementing any restoration steps and foundation settling occurs in pier and beam or block and base when!

Orchids Dracula Simia, Rice A Roni Uk, Duplo Deluxe Brick Box, Food And Diet In Ancient Medicine, Fair Use Examples, Best Orange Juice Uk, Saudi Arabia Humidity, Red Kangaroo Size,

Leave a Reply

Your email address will not be published. Required fields are marked *